Installation for customer in the Event sector

A unique project within a picturesque forest setting, working with natural timber and vaulted ceilings.

We were commissioned to carry out essential works to a toilet and shower block.  This required a complete redesign and fit out of the toilet block and the removal of the shower block along with internal structural walls.

External facades were replaced and upgraded and the whole project had to be completed in compliance with the tight regulations that ensured the building remained in-keeping with the natural beauty of its location.

With a full calendar of events to be held in the forest, a staged hand over process was agreed.

Installation for customer in the Education sector

A tight turnaround project spanning 3 floors, installed with minimal disruption while this university remained open.

With a challenging and immovable deadline for the project to be completed by the time students returned from the summer holidays, we carefully planned and studiously managed the project schedule.

The project entailed the redesign of multiple rooms, a large-scale strip out, tiling throughout and a full electrical and lighting installation package.

Squat pans were specified for installation in each room with complex core drilling required through multiple floors to facilitate waste disposal.

Installation for customer in the Sports sector

A multi-faceted project that entailed the construction and installation of a Changing Places and Communications Room, along with alterations to existing rooms.

Located in central London, we were faced with the challenges of delivering an ambitious project in one of the busiest and densely populated places on the planet.

First we had to extend one of the building’s main corridors, before we could construct new rooms – including new ceilings and internal walls – as well as carry out substantial alterations to existing rooms.

Throughout the project we worked closely with both our client and stakeholders from local councils, to ensure existing finishes were maintained and the new spaces blended perfectly with the existing.

Installation for customer in the Events sector

Manufacture and installation of a standalone Changing Places POD in a beautiful rural environment.

The POD was constructed offsite while our onsite team completed the essential groundworks and drainage. When ready, we coordinated the safe transportation and carful installation in this relatively remote location.

Timber clad to harmonise with the natural environment and surrounding buildings, we commissioned and setup the POD to ensure it was ready to provide many years of service.

Contact Us

Contact us now to discuss your project and get a quote.